
Add to Cart
Material | silicone rubber | |||||
Hardress | from 30~90 shore A | |||||
Color and design | Any popular design according to the drawing, color with transparent, black and any other color as your requirements. OEM/ODM highly welcomed. | |||||
Packing | Plastic bag&carton box or according to your requirements. | |||||
Printing | sublimation or silk printing,etc | |||||
Price | Price is based on size and quantity. Large and regular quantity will be in discount accordingly. | |||||
Sample | Sample is free, buyer pay the mould and post charge. | |||||
Delivery time | Based on the quantity, usually 12-20days | |||||
Min order | 500pcs according to the requirements | |||||
Payment | TT, west union | |||||
Certification | ISO9001: 2008, RoHS, FDA | |||||
Packing | Plastic bag&carton box or according to your requirements. | |||||
Place of Origin | ShenZhen,China | |||||
Quality control | By third party | |||||
Application | Automotive, Industrial, Medical, Agricultural etc. | |||||
Property | High/low temperature resistance, oil and fuel resistance, water resistance, weathering resistance, Ozone resistance etc. |
Very Brief Step:
1. Climents offer drawings in format of STP, igs, prt or solidworks and sufficient information of their plastic parts.
2. We offer the quotation of plastic injection molds and plastic injection molding(plastic parts)in half a day.
3. Clients conside our quotations.
4. Clients place the order.
5. We design and manufacture the rubber injection molds in lead time after confirming the drawings and detailed information with clients again.
6. Rubber injection mold trial samples sent to clients to get their confirmation and see if there is any modification before mass production.
7. Arrange mass production at once and finish the production before the lead time.
8. Delivery by sea or air on time.
Capability of our rubber workshop:
1. ISO9001:2008 certificated factory.
2. Mix materials in house professionally. And we have our own mold workshop.
3. 20 sets of compression machines and 2 sets of injection machines to run mass production.
4. 2 sets of advanced trimming machines to assure non-flash products.
5. 20 QC technicians and 6 R&D engineers, strict quality control and assurance system to assure high quality products.
6. Lead time: 3~10 days.
7. High efficient management to achieve the production cost optimization.
8. OEM and ODM are highly welcomed.